Crude oil storage system at Terminal Omišalj, Krk

Investor
Siemens d.d.

Category
Energy

As part of the project "Expansion of the existing crude oil storage system at the Omišalj Terminal", the third phase of works was carried out, which included the construction of a crude oil filling system at the Omišalj Terminal of the Adriatic Pipeline. It was necessary to fit into the existing system of filling tankers with crude oil. Work was carried out on the construction of a pumping station for shipping oil to a ship with a filter station, work on the construction of a measuring station for measuring the amount of oil shipped to the ship with a control valve and a system for thermal treatment of steam, and work on other smaller elements of the system.

Image

Company

ING-GRAD d.d.
OIB: 93245284305

Kalinovica 3
10 000 Zagreb, HR

fab fa-facebook-square

Contact

ING-GRAD d.d. © 2026, All rights reserved. | Privacy policy | Prvi Program

Select your language

Cookies user preferences
We use cookies to ensure you to get the best experience on our website. If you decline the use of cookies, this website may not function as expected.
Accept all
Decline all
Read more
Analytics
Tools used to analyze the data to measure the effectiveness of a website and to understand how it works.
Google Analytics
Accept
Decline
Advertisement
If you accept, the ads on the page will be adapted to your preferences.
Google Ad
Accept
Decline
Save