In more than three decades of experience working on a series of very demanding energy and infrastructure projects, ING-GRAD managed to complete the entire process of energy production in a diverse list of projects.
These are projects of construction, reconstruction, rehabilitation and extension of wind and thermal power plants, bio-powered power plants and infrastructural facilities. At the very end of the energy circle there is a series of gas stations of the largest Croatian oil company INA - industrija nafte d.d.
Work on these projects is complex precisely because of the challenging terrain, which in many cases is difficult to access, and the work includes everything from the construction of access roads and roads to massive concrete.
Geomechanics and earthworks refer to the construction of reinforced concrete piles that are drilled into the ground and reinforced with special reinforcing baskets or steel profiles that are installed in the wells and filled with concrete. In this way, on soil that is not favourable for foundation, a skeleton structure is made in the ground, which enables the load-bearing capacity of the entire building in the making.
During the restoration of the bridge on the Drava River in Osijek, the caisson foundations of the bridge were repaired by installing reinforced concrete panels - talps, underwater concreting with a concrete mass made according to a special recipe and injecting the foundation soil with micro-concrete.
The construction of the object can be called its skeleton. The classic and most common is the reinforced concrete construction, while the steel construction is used in the construction of large halls or production facilities because it enables faster and easier construction.
In the construction of sewerage systems, we are talking about so-called linear structures, which differ from the construction of classic construction structures. These are facilities that are continuously developed on the given routes in the most populated areas and include, in addition to the construction of the route itself, the construction of accompanying facilities, gravity and pressure collectors, and the rehabilitation of roads damaged during the works.
When building infrastructural and energy facilities, it is necessary to ensure access to the construction site and the facility itself, so in that case, temporary macadam access roads are built, which are created primarily for the delivery and removal of materials, the flow of equipment and people, and are ultimately arranged as a permanent traffic infrastructure of newly built facilities.
Investor
Kermas Istra
Category
Infrastructure
The bridge that connects the Monumenti peninsula and the island of St. Catherine is 233.95 m long, and consists of twenty-one spans ranging in length from 6.95 m to 8.10 m, with a total width of 4.5 m. The reconstruction of the bridge itself consisted of making new piles with a diameter of 50 cm and hidden new horizontal reinforced concrete structures within the dimensions of the existing bridge with complete reinforcement of the original reinforced concrete structure. A new 6-m-wide pavement slab was constructed, consisting of a 5-m-wide pavement and protective curbs on both sides of the bridge. During the execution of the works, access to the execution was difficult for the simple reason that the building is located directly above the sea, and most of the rehabilitation work had to be carried out from a pontoon