Međimurje - CPS Molve pipeline project
Investor
STSI integralni tehnički servisi d.o.o.
Category
Energy
Civil engineering and earthworks were carried out on the construction of the dispatch gas pipeline to the Međimurje CPS Molve junction, namely the excavation, laying and backfilling of the pipeline on the route from the Međimurje junction STAC 0 + 0.00 to STAC 14 + 913.29 mi construction works of all above-ground facilities on the dispatch pipeline: the Međimurje node (BS-1), blocking stations BS-2, BS-3, BS-4, BS-5, BS-6, BS-7, BS-8 and connection stations in CPS- in Molve.