Lukovac wind power plant
Investor
Vjetroelektrana Lukovac d.o.o.
Category
Energy
In the period from January to July 2017, in the municipality of Cista Provo, on the plateau between the ridges of Umac and Jaram - Lukovac at an altitude of 520 to 770 m, the Lukovac wind farm with a power of up to 48 MW was built, which includes 16 wind turbines with plateaus for foundation and technical needs, access roads for the connection of the wind farm with public roads, service roads within the wind farm, internal cable and communication network, transformer station TS 110/30 kV and connection to the transmission network.