Bridge over Dobra river, Karlovac
The condition of the bridge has demanded thorough improvement and reconstruction. The old and dilapidated parts have been removed by hydro mechanical deconstruction, the reinforced-concrete cornice and paths have been renewed, and the new road surface of the bridge has been constructed.
