Wind farm Korlat, Benkovac

The company ING-GRAD d.o.o. began the construction of the wind farm Korlat near Benkovac in June 2019. The deadline for the construction of the wind farm of 63 MW total power, consisting of 18 wind turbines is 16 months. The work includes: construction of access roads and the plateau, wind turbine foundations, MV cable line, substation Korlat 30/110 kV, and access overhead powerline connecting the substation Korlat with the existing overhead powerline.