Reconstruction - expansion of the reservoir area of ​​the Sisak terminal – JANAF

Investor
JANAF – Jadranski naftovod d.d.

Category
Energy

The project of reconstruction-upgrade of the reservoir area of ​​the Sisak oil terminal includes reservoirs A-2513 and A-2512 with associated equipment and infrastructure and its connection with the existing system. The goal of this project was to increase the capacity of the storage space at the Sisak Terminal from the previous 500,000 m3 to 580,000 m3.

In a consortium with the companies Monting d.o.o. and Đuro Đaković d.d., the company ING-GRAD d.o.o. performs construction works that include earthworks and reinforced concrete works. It was necessary to improve the foundation soil with gravel steps, construct reinforced concrete foundation rings and the floor of the reservoir. The prepared bedding consists of a number of layers of different materials that prevent wetting and weakening of the soil, as well as percolation of media into the soil and pollution of groundwater. The diameter of the reservoir is 73 m, and the height is 20 m.



Image

Company

ING-GRAD d.d.
OIB: 93245284305

Kalinovica 3/IV
10 000 Zagreb, HR
fab fa-facebook-square

Contact

ING-GRAD d.d. © 2025, All rights reserved. | Privacy policy | Prvi Program

Select your language

Cookies user preferences
We use cookies to ensure you to get the best experience on our website. If you decline the use of cookies, this website may not function as expected.
Accept all
Decline all
Read more
Analytics
Tools used to analyze the data to measure the effectiveness of a website and to understand how it works.
Google Analytics
Accept
Decline
Advertisement
If you accept, the ads on the page will be adapted to your preferences.
Google Ad
Accept
Decline
Save