Menu
Tablet
Mobile

Bridge over Mrežnica river, Oštarije

The later concrete bridge has been improved and reconstructed. Improvement of the span frame has been executed by applying the hydro mechanical deconstruction system cleaning, by usage of improvement mortar prepared on the construction site, and by the integration of a special kind of concrete, made on basis of di-based aggregate steel and polypropylene fibers, as well as additives, into the road surface.


Address

Kalinovica 3/IV
10 000 Zagreb, Croatia

Phone number

T. + 385 1 / 30 33 000
F. + 385 1 / 38 35 600