Omišalj Terminal Crude Oil Storage System, Krk

Within the Project for the Expansion of the Existing Crude Oil Storage System at the Omišalj Terminal, the Phase III of the work was completed which included the construction of the crude oil loading system at the JANAF Omišalj Terminal. The aim was to fit the new system well with the existing tanker crude oil loading system. The work included the construction of the oil tanker loading pump station with a filter station, the construction of the measuring station to measure the oil loaded onto a tanker with a regulating valve and a steam-based thermal treatment system, as well as the work on other minor system elements.