Logo

Bridge over Drava river, Osijek

The improvement of the caisson-foundations of the bridge has been performed by installing the reinforced-concrete block-boards of the talpi type, by underwater concreting with a mixture prepared on the basis of special prescription and by the injection of the fundamental ground with micro-concrete. Integrality has been reached by arranging – shaping of the river banks around the foundations of the bridge.


Bridge over Drava river, Osijek

ING GRAD d.o.o. © 2018. all rights reserved. Privacy policy